The Plantish Plan of Attack: Trees

| | Comments (0)
Today, the Plantish group outlined our four days of field work:

On the first day we plan to start in the monoculture area of the property to the east of the cabins, and then proceed to the ornamental around the cabins.

On the second day, we will cover Mixed areas M1 and M2 directly south of Teak area 

Day three will cover Teak 2, Teak 3, Teak 4, and Patch 1.

Day four will be Teak 4, M3, Almendeo 1, P2 and P3.

We also hope to survey as much as the Sloth Valley area on the east side as possible by setting up quatrats around the permeter.

We have decided to specialize, and limit our sampling to the types of trees.

Tomorrow is the big day! We get together at 4am to depart Dallas!

Get some sleep!


Leave a comment

About this Entry

This page contains a single entry by Casey Lemke published on May 20, 2010 1:37 PM.

Our area of study.... was the previous entry in this blog.

The team is ready is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.